Original on-batten system sequence. Does not establish VC2 or supplied clip dimensions.
WD-RS-FIELD-001 / Field
Hardwood rainscreen field assembly
What separates the cladding from the water-control layer?
Architectural contextFinished images locate a hypothetical condition. Diagrams show relationships, not approved geometry. Keep project dimensions, fastening and water-management details with the current technical submittal.
Read the relationship
The ventilated space behind the cladding
Follow the water path through the whole wall, including the outlet. This diagram explains the layer relationship; it does not approve substrate attachment, clip fit or a waterproofing system.
Profile and interface
System-specific rainscreen milling. Supplied profile, clip dimensions and tolerances remain pending; no generic deck groove is substituted.
Before this becomes buildable
Apply this guide / Your review notes
Required project evidence
Mark the questions you have reviewed. A checked item records your progress; it does not certify the work.
Review items considered
This checklist is temporary. Print the page to retain the marked review with the guide.
Checking a review item records your review; it does not change the verification state of this library.
Add the junction to your interface schedule ↗Evidence / Revision 2026-09-16
What supports this study?
Source relationships and supplied-product approval are separate. This study has no verified fabrication geometry.
Water-management principles; not a project-specific construction detail.
Resolve the exact supplied profile and production drawing. Unresolved cuts remain unresolved.
Resolve the complete material, profile, substrate and exposure combination.