Wood moisture and movement background; not a fastener, span or profile approval.
WD-CL-FIELD-001 / Field
T&G exterior ceiling field
How do the interlocking boards meet their support?
Architectural contextFinished images locate a hypothetical condition. Diagrams show relationships, not approved geometry. Keep project dimensions, fastening and water-management details with the current technical submittal.
Read the relationship
The underside of a covered exterior ceiling
Identify actual board coverage rather than assuming nominal width is exposed width. The interlock is not a substitute for a documented overhead fastening schedule or site-specific movement allowance.
Profile and interface
Tongue-and-groove production section required. Tongue, groove and bevel geometry are not inferred from the family name.
Before this becomes buildable
Apply this guide / Your review notes
Required project evidence
Mark the questions you have reviewed. A checked item records your progress; it does not certify the work.
Review items considered
This checklist is temporary. Print the page to retain the marked review with the guide.
Checking a review item records your review; it does not change the verification state of this library.
Add the junction to your interface schedule ↗Evidence / Revision 2026-09-16
What supports this study?
Source relationships and supplied-product approval are separate. This study has no verified fabrication geometry.
Resolve the exact supplied profile and production drawing. Unresolved cuts remain unresolved.
Resolve the complete material, profile, substrate and exposure combination.