Wood Details

WD-CL-FIELD-001 / Field

T&G exterior ceiling field

How do the interlocking boards meet their support?

WD-CL-FIELD-001SEE THE DETAILDownload PDF ↗
Architectural concept locating the underside of a covered exterior ceilingArchitectural context

Finished images locate a hypothetical condition. Diagrams show relationships, not approved geometry. Keep project dimensions, fastening and water-management details with the current technical submittal.

Read the relationship

The underside of a covered exterior ceiling

Identify actual board coverage rather than assuming nominal width is exposed width. The interlock is not a substitute for a documented overhead fastening schedule or site-specific movement allowance.

Profile and interface

Tongue-and-groove production section required. Tongue, groove and bevel geometry are not inferred from the family name.

Before this becomes buildable

Apply this guide / Your review notes

Required project evidence

Mark the questions you have reviewed. A checked item records your progress; it does not certify the work.

0/4

Review items considered

This checklist is temporary. Print the page to retain the marked review with the guide.

Checking a review item records your review; it does not change the verification state of this library.

Add the junction to your interface schedule ↗

Evidence / Revision 2026-09-16

What supports this study?

Source relationships and supplied-product approval are separate. This study has no verified fabrication geometry.